Jobsite description and CHRYSO expertise

Built in Turkey, the Eurasia tunnel is a tunnel linking Asia to Europe representing an investment of 1.25 billion US dollars.

This project requires a production of 300,000 m³ of used concrete. CHRYSO®Optima 100 is used to obtain a water/cement ratio of 38%, excellent workability, ease of pumping and exceptional surface quality.

CHRYSO®Air G100 is used to achieve a stable air content of 6%.

 

Used products

  • CHRYSO®Optima 100
  • CHRYSO®Air G100

Project participants

Owner: AYGM (Ministère des transports)
Constructor: YAPI MERKEZ, SK E&C


Other references

Freeway

HIGH-FIVE INTERCHANGE

Construction of a five-level freeway interchange to replace former interchange which has been modified for freeway speeds.

DALLAS, UNITED STATES
View reference
HIGH-FIVE INTERCHANGE
Real estate

THE LEONARDO ENTRANCE

The Leonardo began construction on 17 November 2015.
It is a 55 floor mixed-use property development in Sandton, Johannesburg, South Africa that stands at a height of 234 metres.

SANDTONE, SOUTH AFRICA
View reference
THE LEONARDO ENTRANCE