Jobsite description

Construction of the Outer Circular Highway to the City of Colombo (from Kadawatha to Kaduwela) under the Ministry of Port and Highways Road Development Authority (RDA) which comprises:

  • A 4-lane main highway of 8.9 km long
  • 2 interchanges
  • 21 bridges

CHRYSO expertise

CHRYSO® high performance admixtures provide high workability, high strengths, and good cohesion of concrete and durability of structures.

CHRYSO®Omega 101 and CHRYSO®Omega 104 have been used for superstructures and underground structures, including 1700 bored piles for foundations.

  • Both products are specially adapted for admixture of concrete with crushed sand without increasing the binder dosage
  • 2 hours of maintenance obtained at the required strength level

Used products

  • CHRYSO®Fluid Optima 100
  • CHRYSO®Omega 101
  • CHRYSO®Omega 104

Project technical challenges

CHRYSO®Fluid Optima 100 was used to manufacture 1957 prefabricated beams.

Result:

  • Fluid concrete delivered and high early age initial strengths that facilitated the stripping of the beams
  • Cohesive concrete despite lack of aggregates and variations in local constituents

Project participants

Owner: RDA
Constructor: Taisei Corporation (Japon)
RMC Suppliers, precast Girders: Taisei Corporation
Structural concrete works: Tokyo Supermix
Bored Piles: Access Engineering


Other references

Freeway

HIGH-FIVE INTERCHANGE

Construction of a five-level freeway interchange to replace former interchange which has been modified for freeway speeds.

DALLAS, UNITED STATES
View reference
HIGH-FIVE INTERCHANGE
Real estate

THE LEONARDO ENTRANCE

The Leonardo began construction on 17 November 2015.
It is a 55 floor mixed-use property development in Sandton, Johannesburg, South Africa that stands at a height of 234 metres.

SANDTONE, SOUTH AFRICA
View reference
THE LEONARDO ENTRANCE